Main grid
The main grid can handle many weather phenomena
Although storm winds, lightning, crown snow load, frost and freezing rain pose a threat to power lines, Fingrid is well prepared for problem situations caused by the weather.
Although storm winds, lightning, crown snow load, frost and freezing rain pose a threat to power lines, Fingrid is well prepared for problem situations caused by the weather.
Fingrid has determined that cabling is not the right solution for main grid electricity transmission.
Fingrid Oyj
Läkkisepäntie 21
00620 Helsinki
Tel. 030 395 5267
Fingrid.fi
Cookie declaration
Privacy policy
Fingrid is Finland’s transmission system operator. We secure reliable electricity cost effectively for our customers and society, and shape the clean, market-oriented power system of the future.